

A single source of truth for everyone - client, general contractor, designers and subcontractors
A common data environment (CDE) is a single space where all project information is stored and processed. Models, drawings, documents, issues and correspondence all live in one place, with clear access rights and change history.
Most companies still keep their projects in email, messengers and folders on a network drive. One person works on the latest version of the model, another on the one they downloaded two weeks ago. The result is rework, missed deadlines and disputes. A CDE ends this mess - one source of truth for everyone.
Without a CDE, BIM simply doesn't work: information modeling depends on data living in a shared environment. On top of that, Kazakhstan's new Construction Code (No. 253-VIII, in force since July 1, 2026) makes BIM, known locally as TIMSO, part of an asset's life cycle, with stricter digital requirements for state-funded and technically complex projects.
We implement a CDE following ISO 19650 logic: document statuses, roles, permissions and approval workflows configured to your own procedures. No "buy the software and figure it out yourself".
Autodesk Forma
Autodesk's cloud CDE: works directly with Revit and Navisworks, with approvals, issues and document version control.
→ AEC Collection · Revit
Signal
A common data environment with built-in construction control: documentation, issues, 360° panoramas, planned vs. actual analytics, BIM model.
→ More about Signal
SODIS Docs / SODIS CM
A CDE built for Kazakhstan's standards: technical document workflow (design, working and as-built documentation) and construction management linked to the BIM model.
→ SODIS Docs · SODIS CM · Sodis Lab
How we implement - five stages
- Audit. We look at how you work with documents and models today and where time gets lost. Without this, implementation makes no sense.
- Pilot. We deploy the CDE on one project. A small team, quick results, visible impact.
- Process setup. Roles, permissions, ISO 19650 statuses and approval templates, matched to your procedures.
- Training. We teach your team to work in the system hands-on, on your own projects, not from a manual.
- Rollout and support. We scale it across the company, with support from our team in Almaty in Kazakh, Russian and English.
CDE platforms available in Kazakhstan compared:
| Criterion | Autodesk Forma | Signal | SODIS | Procore | Revizto | Aconex |
|---|---|---|---|---|---|---|
| Support in Kazakhstan | ✓ SD Soft | ✓ SD Soft | ✓ SD Soft | — | partial | — |
| Russian interface | ✓ | ✓ | ✓ | partial | ✓ | partial |
| BIM (Revit / IFC) | ✓ native | ✓ | ✓ | ✓ | ✓ | ✓ |
| ISO 19650 document workflow | ✓ | ✓ | ✓ RU/KZ standards | ✓ | partial | ✓ |
| Availability in Kazakhstan | ✓ | ✓ | ✓ | ⚠ | ✓ | enterprise |
Autodesk Forma, Signal and SODIS are three independent CDE solutions in SD Soft's portfolio for different needs and budgets. Our strength is local support and on-site implementation in Almaty.
Common Data Environment (CDE) implementation in Kazakhstan
FAQ - common questions about CDE
How is a CDE different from a regular cloud drive?
A drive just stores files. A CDE manages them: versions, statuses, permissions, approval history and links to the BIM model. You always know which version is current and who approved it.
Is a CDE mandatory under the Construction Code?
Code No. 253-VIII (in force since 01.07.2026) makes TIMSO part of an asset's life cycle. Digital requirements are stricter for state-funded and technically complex projects. Check how they apply to your projects against the current TIMSO codes of practice.
How long does implementation take?
A pilot takes from a few weeks. Full rollout depends on company size and the number of disciplines. We'll give you a realistic timeline after the audit.
We already work in Revit. Will it fit?
Yes. Autodesk Forma (formerly Construction Cloud) connects directly with Revit and Navisworks.
Free · Download PDF (in Russian)
Is your company ready for TIMSO/BIM?
A 100+ point express audit to assess your digital maturity and find weak spots before implementation starts. Aligned with Kazakhstan's new Construction Code.
Request a CDE implementation consultation
By clicking “Send request”, you consent to the processing of your personal data in accordance with the Privacy Policy and the Law of the Republic of Kazakhstan No. 94-V “On Personal Data and Their Protection”.




Webinar: Common Data Environment - the foundation of information exchange
June 24, 2025 | Speaker: Anna Kukina, BIM Manager, SD Soft
We covered what a CDE is, why it's the foundation of BIM, and the ISO 19650 approach to information management (in Russian).



